Music Man Set Build

Here are a few pictures from the set build process for The Music Man. I designed the sets and my dad came up and we spent a few days building everything and I painted after he had left. We probably spent a good 60 hours on it over the 4 days. Needless to say I’ve slept zero winks and gone to very few of my classes. But its finished so now I can (hopefully) catch up. I’ll post the finished product, paint and all, tomorrow. Thanks for stopping.

Also, I made this post entirely on my phone so I don’t know if the pictures will end up really large or too small, apologies.

20121116-135349.jpg

20121116-135517.jpg

20121116-135533.jpg

20121116-135548.jpg

20121116-142849.jpg

20121116-142908.jpg

20121117-022128.jpg

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s